Leach field pipes are typically installed 18 to 36 inches below ground level depending on local codes soil type and climate. The trenches are usually 1 to 3 feet wide filled with gravel surrounding perforated pipes. Deeper installations may be required in areas with high water tables or frost lines. Proper depth ensures adequate soil treatment of effluent before reaching groundwater. Never drive heavy equipment or build structures over the leach field area.